Over the weekend, the Baltimore District of the U.S. Army Corps of Engineers said a 440-ton piece of the bridge was lifted. All of the debris that is removed from the Key Bridge, is brought to Tradepoint Atlantic in Sparrows Point.
Tradepoint has a five-acre facility, with direct access to the water, where all of the debris is brought. FOX45 was able to see the wreckage up close, going on a tour of TradePoint Atlantic.