On the Coruh River in northeastern Turkey, a 273-meter-high arch dam for a hydroelectric power plant is under construction. Four EC-H cranes are being used to build the dam: two 280 EC-H 12 Litronic, one 200 EC-H 10 Litronic and one 154 EC-H 6 Litronic.